City Government‎ > ‎Bids‎ > ‎

Open Bids

RFQ - Design Build Services (Exit 118)

posted Feb 12, 2015, 10:33 AM by Tysha Blaber   [ updated Feb 12, 2015, 3:03 PM by Tyson Kennedy ]

REQUEST FOR QUALIFICATIONS (RFQ)
FOR DESIGN-BUILD SERVICES

I-15 EXIT 118 INTERCHANGE
MESQUITE, NV

This Request for Qualifications (RFQ) is issued by the City of Mesquite (COM) to select a limited number of qualified Design-Builders to design, construct, and conduct other identified activities for the EXIT 118 (117.5) & LOWER FLAT TOP MESA, I-15 TO PIONEER BLVD Design-Build (DB) Project, hereinafter referred to as the Mesquite Exit 118 Interchange Project.

The proposed Mesquite Exit 118 interchange project includes the design and construction of a new interchange on I-15 at milepost 118. Work elements are expected to include bridge and roadway construction, grading, earthwork, utilities, paving, lighting, signing, striping, drainage, public involvement, and environmental compliance. The estimated project value is between $12-15 Million depending on final scope of work determination.

Statements of Qualifications (SOQs) will only be accepted from DB Respondents intending to provide all services required under the Contract. Responses from individual engineering, construction, or consultant firms not offering to provide all required services will not be accepted.

Each Respondent is responsible for acknowledging in its submittal letter that it has received all Addenda issued. A list of potential Respondents will be generated from the web forms and will be updated on the website regularly.

Parties interested in responding to this RFQ must complete the on-line SOQ registration form at http://projects.horrocks.com/MesquiteExit118/. Upon completion of the form, the Respondent will receive an email confirmation and be redirected to a webpage where they may download the RFQ and other associated project information. Any subsequent Project addenda information or other Project notifications will only be sent to those firms that complete the form.

SOQ’s from Respondents are due no later than 5:00 pm PST on March 11, 2015. Details of the required SOQ submittal procedure are outlined in the RFQ.

Any questions regarding this RFQ or the project in general should be directed to: Horrocks Engineers, Attn: Wayne Horlacher, PE, 1349 Galleria Dr, Ste 110, Henderson, NV 89014 Tel:702.966.4063; Email: wayneh@horrocks.com.

The COM reserves the sole right, without incurring any liability, to change any aspect of the proposed procurement described above, including the right not to proceed with the procurement and/or the right to proceed in a different manner or on a different timeline than as described above.

1-1 of 1