Electrical Permit

Permit Information

Electrical Permit

Electrical Permits are required for any installation, modification, or repair, of electrical systems including:

  • Concealed Wiring
  • Electrical Service

Electrical Permits are not required for:

If a permit is required, this guide may help you through the permit process. A Flow Chart is also available for your assistance.

An Electrical Permit Package consists of:

  • One Electrical Permit Application 
  •  Form - Permit - Electrical.pdf
  • Two drawings of the installation, modification, or repair. Plans must comply with the 2017 National Electric Code (NEC)
  • Two copies of electrical calculations if required

Electrical Permit

Electrical Permit

Electrical Permits are required for any installation, modification, or repair, of electrical systems including:

  • Concealed Wiring
  • Electrical Service

Electrical Permits are not required for:

If a permit is required, this guide may help you through the permit process. A Flow Chart is also available for your assistance.

An Electrical Permit Package consists of:

  • One Electrical Permit Application 
  •  Form - Permit - Electrical.pdf
  • Two drawings of the installation, modification, or repair. Plans must comply with the 2017 National Electric Code (NEC)
  • Two copies of electrical calculations if required

Preparing the documents

  1. Print off or pick up an Electrical Permit Application. Fill out all information and sign application as contractor or owner / builder.
  2. When plans are drawn by: Architect or Engineer – Plans must be wet stamped and signed on every page. Provide 2 sets of Plans on minimum 11 x 17 sheets of paper.
  3. Contractor – Plans must list contractor information and be signed on every applicable page.
  4. Owner – Plans must be designed and signed by owner of every page. An owner can only draw plans for his own place of residence.

Submitting the Application

  1. Bring the Electrical Permit Package to the Mesquite Building Department, located in City Hall at 10 E. Mesquite Blvd.
  2. A submittal fee must be paid when application is submitted. This fee will be applied to the permit. ($40 for Residential and $75 for Commercial)
  3. Plan review time is approximately 10-21 working days each time the application is submitted.Complete and accurate plans will shorten the time needed for review and resubmittal.

Corrections and Resubmitting

  1. If corrections are needed on the plans, the plan reviewer will call for you to pick up the plans. Plan Review Comments will be attached to the plans listing the corrections needed.
  2. Make the corrections and resubmit a full Electrical Permit Package, Comment Sheet, and Sign-Off Sheet. No further payment is needed for resubmittal.

Picking up the Approved Permit

  1. The Permit Technician will call when the permit is approved. They will tell you if additional fees are required.
  2. Come in to the Mesquite Building Department and pay additional fees, if any. You will be given a copy of the permit, an approved set of plans, and your receipt.
  3. If you are not sure of what inspections will be required, talk to the Permit Technician before you leave.

What’s the Next Step?

Click here for instructions on scheduling inspections.