Starting Monday, September 14th traffic controls will be in place until September 18th. See information attached.
TEMPORARY TRAFFIC SHIFT AND SINGLE-LANE CLOSURESLocation: West Pioneer Boulevard (Between Auto Mall Circle and Willis Carrier Canyon)Dates: September 14, 2026 to September 18, 2026Time: 24 hours
Notice is hereby given that starting on September 14, 2026, a temporary traffic shift will be implemented on West Pioneer Boulevard to accommodate the installation of four water main laterals.
During this period, all vehicular traffic will be restricted to one half of the street.
What to Expect:
Traffic Flow: The unaffected side of the street will be converted into two-way traffic. Eastbound traffic will travel on a gravel surface. Speed will be reduced to 25 MPH.



